Scrumban

Goal-oriented planning with a pull system and explicit flow controls.

Scrumban combines Scrum's goal-oriented planning with Kanban's pull-based flow and WIP controls. You can set a delivery goal without batching all work into a sprint. Work is pulled based on capacity, not pushed into a fixed-length timebox. Flow metrics sit alongside goal progress, so the team can see whether the system is healthy while moving toward an outcome.

What it's for

Scrumban works well for Scrum teams moving toward continuous flow, or teams that need to balance planned work against unplanned demand — teams that want the accountability of a goal without the overhead of strict sprint boundaries.

Work item types

TypeDescription
EpicA larger product outcome
StoryA valuable product slice
BugA defect to correct
TaskSupporting work
SpikeTimeboxed learning work

Epics sit at the root. Stories, bugs, tasks, and spikes roll up into epics.

Workflow

The board uses five columns:

ColumnMeaning
BacklogWork waiting to be pulled
To DoWork committed for the current period
In ProgressActive work (WIP limit: 5)
In ReviewWork awaiting feedback (WIP limit: 3)
DoneCompleted work meeting the Definition of Done

Work is pulled only when capacity opens up. WIP limits signal when the team should finish rather than start.

Cadences

Skopo calls these Rituals in the sidebar for Scrumban projects.

CadenceWhenPurpose
Goal planningOptional cadenceSet a timeboxed delivery goal without batching all work into a sprint
ReplenishmentAs neededPull ready work based on capacity
Daily flow syncDaily or as neededInspect blockers, aging work, and WIP without status-reporting theater
Flow reviewWeeklyInspect aging, blocking, and WIP trends
Service delivery reviewBiweeklyReview throughput, cycle time, and service-level expectations
RetrospectiveRegularlyImprove the delivery system

Artifacts

  • Delivery goal — a shared outcome the team is working toward, set during goal planning without forcing all work into a single sprint.
  • Definition of Done — the shared quality checklist every item must meet before moving to Done.
  • Service-level expectation — the target elapsed time from commitment to delivery, configured in Project Settings.

Metrics

MetricWhat it measures
ThroughputItems completed per period
Cycle timeElapsed delivery time from when work starts to when it finishes
Goal completionProgress against the current delivery goal